A379 at Stoke Fleming re-opens

The A379 at Stoke Fleming has re-opened this morning. Almost 30 metres of privately owned boundary wall running alongside the highway has now been taken down and made safe. The road has been closed for a month after a five-metre crack appeared in a 16ft high section of the wall – making it a safety

The post A379 at Stoke Fleming re-opens appeared first on News.

Source link